|
LaCasa Grande Estates Water and Sewer District – East Helena, MT – KirK evaluated necessary changes to this Public Water Supply System. KirK was retained to design and oversee construction of the main-line piping system, as well as oversee changes to the pumping system and other infrastructure. The system has over 150 connections, 3-wells and a steel storage tank.
Subdivision Water Supply – numerous sites in Montana – KirK provides aquifer testing, predictive groundwater modeling, impact assessment and mitigation plans for developers seeking new water supplies.
Where a new or increased water supply is needed KirK provides water development and water rights permitting. |


|
Fax 406-842-7230 |
|
Phone 406-842-7224 |

|
Water Supply System Design |




|
KirK Home |
|
About KirK |
|
Services |
|
Contact Us |
|
Project Links |