LaCasa Grande Estates Water and Sewer District – East Helena, MT –   KirK evaluated necessary changes to this Public Water Supply System.  KirK was retained to design and oversee construction of the main-line piping system, as well as oversee changes to the pumping system and other infrastructure.  The system has over 150 connections, 3-wells and a steel storage tank.

 

Subdivision Water Supply – numerous sites in Montana –   KirK provides aquifer testing, predictive groundwater modeling, impact assessment and mitigation plans for developers seeking new water supplies.

 

Where a new or increased water supply is needed KirK provides water development and water rights permitting.

Text Box: Text Box:

Email

 

 

Fax  406-842-7230

Phone  406-842-7224

Text Box: Construction underway of a new water delivery system.

Water Supply System Design

Text Box: Predicted drawdown impacts to neighboring wells from subdivision.
Text Box: Text Box:

KirK Home

About KirK

Services

Contact Us

Project Links